In 2008, PSD supplied remediation contractor VHE Construction with equipment that formed part of the soil washing plant for the remediation of the former Bristol Diesel Depot adjacent to Temple Meads Railway Station for the Bristol Arena site. The project was commissioned by the South West England Regional Development Agency.
VHE rented from PSD, an SM250DP desander, SU10DP desilter, flocculation mixing and dosing equipment with sedimentation tank and an S4-1-H co-current centrifuge as part of the soil washing plant. Over a period of abouit 26 weeks, around 35,000 m3 of hydrocarbon contaminated soil was "washed" and the wash water was flocculated and centrifuged to allow it to be re-used. PSD's equipment was reliable and performed very effectively.
|